Bathroom Vanity Cabinet Specification Sheet Template for Hotels: Fields Buyers Should Fill In Before Requesting Quotes
A practical, field-by-field vanity specification sheet that fits on one page and helps factories quote accurately. Fill it in once and every supplier prices the same thing.
A vanity specification sheet is a one-page document that describes every bathroom unit in your hotel project in a format a factory can price without guessing. When buyers send only a photo and a room count, each supplier fills the gaps differently, and the quotations that come back cannot be compared. A well-completed sheet removes that problem and shortens the time from enquiry to a firm offer.
Below is a field-by-field vanity spec template you can copy into a spreadsheet or document. It works for new builds and renovations in any region, and it is deliberately short, because a sheet that is too long rarely gets completed.
Why a one-page format works
Factories quote faster when information arrives in a predictable order. Procurement teams also benefit, because the same sheet can be reused for every model in the hotel and for later properties in the same group.
Think of the sheet as a technical brief rather than a design document. It states what must be built, in what quantity, to what standard and delivered where. Mood boards and renders can be attached, but the sheet is what the price is based on.
Section 1: Project and commercial data
Start with the information that frames the whole quotation.
- Project name and location: city and country, because climate, fire rules and import procedures affect the specification.
- Hotel category and operator: economy, midscale, upscale or luxury, and whether a brand standard applies.
- Required quotation date and target delivery window: link this to your construction programme, not to a wish date.
- Preferred Incoterm: EXW, FOB, CIF or DAP, plus the port or site of delivery.
- Installation scope: supply only, supply and supervision, or supply and full installation.
- Currency and payment structure: stated as a request, to be confirmed in the offer.
Section 2: Model identification and quantities
Give each vanity type a short code, for example V1, V2 and V3, and use it on every document. This is the single most useful habit for avoiding ordering errors later.
| Field | What to write | Why it matters |
|---|---|---|
| Model code | V1, V2, V3 | Keeps drawings, quotes and packing lists aligned |
| Room types served | Standard, suite, accessible | Shows where variants are needed |
| Quantity per model | Total units | Determines tooling and batch planning |
| Hand variants | Left, right or symmetrical, with split of quantities | Prevents mirrored-layout mistakes |
| Spare allowance | Number of extra units or parts, if wanted | Lets the supplier price spares in the same run |
Section 3: Dimensions and configuration
State dimensions in millimetres first, with inches in brackets if your team or operator works in imperial. For example, a width of 900 mm (35.4 in).
- Overall width, depth and height, and whether the height includes the top and any upstand.
- Mounting type: wall-hung, floor-standing, console or freestanding washstand.
- Front configuration: doors, drawers, open cavity or open shelf, with the number of each.
- Plumbing cut-outs: waste position, supply positions and any access panel needed.
- Clearances that are fixed by the room: door swing, distance to toilet, side walls and accessories.
- Accessibility requirements, such as knee clearance or open-front design, if applicable.
Attach an elevation and a plan for each model. A simple hand-marked drawing is better than none, provided dimensions are readable.
Section 4: Materials and construction
This section is where most quotation differences hide, so be specific. If you are unsure of the right choice, write the performance requirement and ask the factory to propose a solution.
- Carcass board: moisture-resistant MDF, HPL-faced board, marine plywood or another type, with thickness.
- Fronts: lacquer, veneer, laminate, HPL or stone-effect surface, and edge treatment.
- Edge banding: PVC, ABS, laser or PUR, and whether concealed edges must be sealed.
- Back panel and stretchers: thickness and fixing method, especially for wall-hung units.
- Top material: solid surface, quartz, natural stone, engineered stone or laminate, with thickness and edge profile.
- Basin type and supplier: undermount, vessel or integrated, and whether the basin is supplied by the factory or by others.
- Backsplash or upstand: yes or no, height and material.
- Sealant: type and colour where the unit meets the top, basin and wall.
For choices within this section, our guides on moisture-resistant boards and countertop materials explain the trade-offs in more detail.
Section 5: Hardware and accessories
Hardware is small in cost but large in complaints, so name it clearly.
- Hinge type, opening angle and soft-close requirement.
- Drawer runner type, load rating and full or partial extension.
- Handle or finger-pull style and finish, with attention to corrosion in humid bathrooms.
- Integrated items: hair dryer holder, amenity tray, towel shelf, laundry pull-out.
- Mirror, mirror cabinet or lighting: whether it is inside or outside the joinery package.
- Electrical items: sockets, LED strips or sensor lighting, with the required IP rating and who supplies the driver.
If you accept equivalent brands, say so. Listing a reference brand and writing "or approved equal" saves a round of questions.
Section 6: Finishes, colours and samples
- Finish code or reference for each visible surface, such as front, carcass interior and top.
- Colour reference system, for example RAL, NCS or a physical sample you will send.
- Sheen level, such as matt, satin or gloss.
- Any requirement for anti-fingerprint, anti-bacterial or stain-resistant behaviour.
- Whether a sample board or prototype unit is required before production.
Colour matching between fronts, tops and wall panels depends on shared references, so give the same code to every trade where possible.
Section 7: Compliance and documentation
Requirements differ between regions, so state what the project actually needs rather than assuming.
- Fire performance requirement for boards and finishes, if the local code or operator demands one.
- Emission class or formaldehyde requirement applicable in the destination market.
- Timber documentation, if certified or legally sourced wood is required.
- Test reports or data sheets you expect with the offer.
- Handover documents: care instructions, finish codes and as-built drawings.
Do not copy a requirement from another project without checking it. If you do not know the rule for your market, ask your consultant and mark the field as "to be confirmed".
Section 8: Packing, shipping and site conditions
- Packing method: crated, palletised or carton, and whether stone tops and basins are packed separately.
- Labelling: by model code, room number or floor.
- Delivery sequence: all at once or in phases.
- Site access: lift size, stair width, loading dock, storage availability and any restrictions on delivery times.
- Final destination and consignee details, including whether the site is landlocked or a long way from the port.
Section 9: Attachments checklist
Before you press send, check that the following are attached or clearly marked as to follow:
- Elevations and plans for each model code.
- Bathroom layout showing plumbing positions.
- Finish references or physical samples.
- Room schedule and quantity table.
- Basin and tap data sheets, if supplied by others.
- Construction programme or key dates.
How to make quotes comparable
Once suppliers respond, line up their offers against your sheet, field by field. Differences in board type, top thickness, hardware or packing usually explain the price gaps. Ask each supplier to answer in the same order as your sheet, and mark any item they have changed or excluded.
This approach also exposes missing lines early, such as installation, basin cut-outs or crating, which otherwise appear as extras after the order.
Common mistakes when filling in the sheet
- Leaving the top and basin supply responsibility undefined.
- Giving dimensions without stating whether they include the top or upstand.
- Writing "waterproof" instead of naming a board and edge sealing method.
- Forgetting hand variants for mirrored bathrooms.
- Omitting delivery access, then discovering that units do not fit through the lift.
Next step
You do not need a perfect sheet to start. Fill in what you know, mark the rest as open, and send it with your bathroom drawings. We will review the information, point out gaps and come back with material suggestions, an estimated lead time and shipping options for your project.
Sıkça Sorulan Sorular
What is a vanity specification sheet?
A vanity specification sheet is a short technical brief that lists the models, quantities, dimensions, materials, hardware, finishes, packing and delivery details of the bathroom units in a hotel project. It lets a factory price the work accurately and lets you compare quotations on the same basis.
How detailed should a vanity spec template be?
One page per project, with a short entry for each model code, is usually enough. Include everything that changes price or build: size, board, top, basin, hardware, finish and packing. Mark uncertain fields as open so the factory can suggest options rather than guess.
Do I need drawings to request a quotation?
Drawings are strongly recommended. Even a simple elevation and a plan with plumbing positions is far more reliable than photos. If drawings are not ready, send the sheet with reference images and dimensions, and expect the quotation to carry assumptions that will be refined later.
Should the specification sheet name hardware brands?
Naming a reference brand for hinges and runners helps suppliers price to your standard. Add "or approved equal" if you accept substitutions, and state the required load rating or soft-close function so equivalents can be judged fairly.
Who should supply basins and tops?
It depends on the project. Specify clearly whether the cabinet maker supplies tops and basins or whether others do. If others supply them, provide data sheets and cut-out templates early, because the cabinet size and sealing details depend on them.
Can one sheet cover several hotel properties?
Yes. Many groups keep a master sheet with approved model codes and finishes, then add a project page for quantities, location and delivery. This keeps specifications consistent and reduces the effort of preparing each new enquiry.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.




