How to Read a Door Model Quotation: Line Items, Exclusions and What Is Often Missing
A door quotation is only useful if you know what it covers and what it leaves out. This guide walks through the line items, typical exclusions and the gaps buyers most often discover too late.
A proper door quotation breakdown tells you exactly what you are buying, in what quantity, to which specification and under which delivery terms. Two offers for the same project can differ by a wide margin, not because one supplier is more efficient, but because one includes frames, hardware preparation and packing while the other does not. This guide shows you how to read a door supplier quotation line by line and how to spot what is missing before you sign.
Why quotations that look similar are rarely equal
Door packages have many components: the leaf, the frame, the architrave, finishing, hardware preparation, packing, transport and sometimes installation. A supplier can quote only some of these and still present a clean, attractive total.
That is why comparing the bottom line alone is risky. Before comparing prices, compare scope. A lower total that excludes frames or export packing may turn out to be the more expensive offer once the missing items are added.
The core line items you should expect to see
A well-prepared offer separates the main elements so that you can compare them with other suppliers. Look for the following.
Door leaves
- Model reference: the model name or code, ideally matching the drawing or catalogue page you approved.
- Dimensions: width, height and thickness in millimetres, listed per door type or per schedule mark.
- Core and construction: for example solid timber, particleboard, honeycomb or mineral core, since this affects weight, acoustics and fire performance.
- Surface and finish: veneer species, HPL, lacquer or paint, with colour or sample reference and gloss level.
- Quantity and handing: the number of left and right hand leaves where relevant.
Frames and architraves
Check whether the offer includes door frames (jambs), stops and architraves, or whether these are quoted separately or not at all. Frame section, wall thickness it fits and the finish should be stated. If your schedule shows frames but the quotation lists only leaves, that is the first gap to query.
Hardware and preparation
This is the area where misunderstandings are most common. There is a difference between supplying hardware and preparing the door for hardware. Ask the supplier to state clearly which of these apply:
- Hinges supplied, or only hinge recesses routed.
- Lock case and strike preparation, with the lock model or template identified.
- Electronic lock routing and cable paths, if your project uses card or smart locks.
- Peephole drilling, closer fixing preparation and door stops.
If hardware is supplied by a third party, the factory needs the templates or product data sheets before production. A quotation that says nothing on this topic often means preparation is not included.
Commercial lines that are easy to overlook
Packing
Export packing protects finished edges and surfaces during long transport. A quotation should state whether packing is included and how the doors are protected, for example film, corner protection and cartons or crates. Wooden crates or palletising may be a separate line. Ask who is responsible for damage in transit and how packing relates to the agreed shipping terms.
Shipping terms
The Incoterm determines who pays for and controls each stage of delivery. Compare offers on the same basis. An EXW price excludes loading, export clearance and freight, while FOB, CIF or DAP include progressively more. Without a stated Incoterm and named port or place, a total price cannot be compared properly.
Samples and mock-ups
Check whether a prototype door or sample board is included, whether it is charged separately and whether the cost is credited against the main order. Also confirm who pays for sample shipping.
Installation
Installation is usually a separate service. If you need on-site installation or supervision, it should appear as its own line with a clear scope. If it is not mentioned, assume it is excluded.
A quick table of common gaps
| Item | What may be missing | What to ask |
|---|---|---|
| Frames and architraves | Quoted for leaves only | Are frames, stops and architraves included, and in which finish? |
| Hardware | Only preparation, or nothing | Which hardware is supplied and which is prepared only? |
| Electronic lock routing | Not priced | Is routing and cable path preparation included? |
| Packing | Basic packing only | What protection is used and is export packing included? |
| Shipping | No Incoterm stated | Which Incoterm and named place apply? |
| Spare leaves | No allowance | Is an overage for damage or reorders included? |
| Installation | Not mentioned | Is installation offered, and what does it cover? |
Understanding door quote exclusions
Most quotations contain a section called exclusions, notes or conditions. Read it carefully, because it often explains the price difference between offers. Typical door quote exclusions include:
- Taxes, duties and import clearance at the destination.
- Hardware, glass, seals or kick plates supplied by others.
- Fire certification costs or testing, if specific reports are required.
- Site measurement, installation and snagging.
- Changes after approval of drawings or samples.
Exclusions are not a problem in themselves. The problem arises when you assume an item is included and it is not. Ask for the exclusions to be listed in plain language and confirm anything that matters to your programme.
Check specification wording, not just price
Vague descriptions allow room for interpretation. A line such as walnut door is not enough. A useful description names the veneer or material, the construction, the thickness, the finish system and the reference sample.
If you have a door schedule, ask the supplier to number each line according to your schedule marks. This makes it easy to see whether every door type has been priced and whether quantities match.
Pricing basis: per leaf, per set or per square metre
Confirm what the unit price covers. A per-leaf price may include only the leaf, while a per-set price may include the leaf, frame and architrave. A per-square-metre price needs a clear definition of the area counted. Without this, it is not possible to compare offers properly.
Validity, payment and timing
Look at the validity period of the offer, since material and freight costs can change. Review the payment terms and the milestones linked to them. Lead time depends on the model, finish approval, hardware data and order size, so the quotation should state what the production period counts from, for example from approved drawings and deposit rather than from the order date.
A practical checklist before you compare offers
- Match every line to your door schedule marks.
- Confirm leaf, frame and architrave scope.
- Clarify hardware supply versus preparation.
- Check packing method and Incoterm.
- Read exclusions and conditions in full.
- Confirm sample, mock-up and installation terms.
- Rebuild each offer on a common scope before comparing totals.
Next step
If you are comparing offers or preparing a request, send us your door schedule and drawings. We will return a clearly itemised quotation that states what is included, what is excluded and which details we still need from you, so you can compare it with confidence.
Sıkça Sorulan Sorular
What should a door quotation include?
At minimum, it should list door models, dimensions, thickness, core, finish, quantities, frames and architraves if required, hardware supply or preparation, packing, the Incoterm, payment terms, validity and exclusions. Each line should be traceable to your door schedule.
Why do two door quotations for the same project differ so much?
Usually the scope differs. One offer may include frames, hardware preparation and export packing, while another covers only the leaves. Different Incoterms, finishes, core types and pricing units can also change the total.
What is the difference between hardware supply and hardware preparation?
Supply means the factory provides the hinges, locks or closers. Preparation means it routes or drills the door to receive hardware you or another supplier provide. Prepared doors need templates or data sheets before production starts.
Are frames normally included in a door quotation?
Not always. Some suppliers quote leaves only, and frames or architraves are a separate line or not offered. Check your schedule against the quotation and ask directly whether frames, stops and architraves are included and in which finish.
How can I compare door quotations fairly?
Rebuild each offer on the same scope: same models, frames, hardware status, packing and Incoterm. Then compare unit prices on the same basis, whether per leaf or per set. Add any missing items to each offer before judging the total.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.




