What Is a Bedroom Furniture Bill of Quantities and How Should Hotel Buyers Use It?

A bedroom furniture bill of quantities lists every item, size, finish and quantity in your guest room package. This guide explains how to build one and how it connects to an accurate factory quotation.

A bedroom furniture bill of quantities (BOQ) is a structured document that lists every furniture item in your hotel rooms, with its description, dimensions, material, finish and quantity. Its job is simple: it makes sure you and the factory are pricing exactly the same scope. For hotel owners, procurement managers and designers, it is the bridge between the design drawings and a quotation you can actually compare and approve.

Below we explain what a BOQ contains, how it differs from other project documents, and how to use it from the first enquiry through to delivery. We work with buyers worldwide from our factory in Istanbul, so the examples reflect international projects.

What a bedroom furniture BOQ actually is

Think of the BOQ as a priced shopping list written in technical language. Each line describes one item type, states how many are needed in total, and leaves space for a unit price and a line total. Without it, a factory has to guess quantities from drawings, and every guess becomes a risk for both sides.

In a hotel project, the BOQ is usually part of the wider FF&E package. An FF&E BOQ for hotel rooms covers fixed and loose furniture, while OS&E items such as hangers, trays and linen are normally handled separately. Keeping that boundary clear avoids arguments about what was included.

BOQ, room schedule and shop drawings: what is the difference?

These documents are often confused, yet each has a different purpose.

  • Room schedule: shows how many rooms of each type exist and which furniture each type contains.
  • Furniture quantity schedule: multiplies the room schedule out into total quantities per item.
  • Bill of quantities: adds specifications and pricing columns to that schedule so it can be quoted.
  • Shop drawings: the detailed production drawings prepared after the order, showing construction, fixings and exact dimensions.

In practice, the BOQ comes before shop drawings. It fixes scope and price; the drawings then fix the detail. If the BOQ is vague, the shop drawing stage is where surprises appear.

What each BOQ line should contain

A useful line is specific enough that two different factories would understand it in the same way. We suggest the following columns:

  • Item code: a unique reference such as WD-01 for a wardrobe type, matching the drawings.
  • Description: the item name and short function, for example "wardrobe with two hinged doors, hanging rail and safe shelf".
  • Dimensions: width, depth and height in millimetres, with imperial in brackets if your team uses it.
  • Materials: carcass board, door facing, edge treatment and any solid timber parts.
  • Finish: veneer, HPL, lacquer or paint, with the colour reference or sample number.
  • Hardware: hinges, runners, handles, locks and soft-close requirements.
  • Fire and compliance notes: any fire-retardant or emission requirements of the destination market.
  • Quantity and unit: total pieces, or linear metres for fitted joinery.
  • Unit price and total: filled in by the factory.

Typical items in a guest room BOQ

A standard guest room package often includes the bed base, headboard, bedside tables, wardrobe, desk and chair, luggage rack or bench, minibar or coffee unit, mirror and sometimes a TV panel. Suites add dressing tables, drawer chests, sofas or extra storage.

List each room type separately first, then consolidate. For example, if 60 rooms are Standard and 20 are Junior Suites, calculate each item per type before adding the totals. This makes later changes much easier, because adjusting one room type only affects its own lines.

Fitted joinery: count differently

Loose furniture is counted in pieces, but fitted wardrobes, wall panelling and headboard walls are often counted in linear or square metres. Whichever unit you choose, state it clearly and keep it consistent. A joinery BOQ template that mixes pieces and metres without notes is one of the most common sources of misunderstanding.

For fitted units, also record site conditions that affect the work, such as uneven walls, ceiling height variations or scribing requirements. These do not change quantities, but they do affect the price and installation time.

How the BOQ ties to the factory quotation

A quotation is only as reliable as the BOQ behind it. When you send a BOQ, the factory prices each line against its own material and labour costs, then adds packing, shipping terms and, if required, installation. The result is a quotation that mirrors your structure line by line.

This has three practical benefits:

  • Comparability: if two suppliers price the same BOQ, differences in unit price are easy to see and discuss.
  • Traceability: each priced line links back to a drawing code, so there is no doubt about what is included.
  • Change control: when you add, remove or modify an item, you can adjust one line instead of renegotiating the whole offer.

Ask the factory to keep your item codes and order in its quotation. If the offer comes back in a different structure, it becomes hard to check for missing items.

Items buyers often forget to list

Some costs sit outside the furniture items themselves but still belong in the scope. Check whether your BOQ and the matching quotation address:

  • Packing method and export-grade protection
  • Spare parts or extra stock, such as spare doors or drawer fronts
  • Samples and the mock-up room
  • Installation, supervision or snagging visits
  • Delivery terms, for example EXW, FOB, CIF or DAP
  • Documents required for customs clearance

Showing these as separate lines, even with a zero or "by others" entry, makes responsibilities visible.

A simple process for building your BOQ

  1. Start from the room schedule. Confirm room types and counts with the design team.
  2. Assign item codes. Match them to the drawings or the designer's furniture legend.
  3. Add specifications. Include dimensions, materials, finishes and hardware, or reference a specification document.
  4. Calculate totals. Multiply per-room quantities by room counts and check the arithmetic twice.
  5. Add a spares allowance. Decide whether you want extra stock and list it separately.
  6. Send with drawings. Attach plans, elevations and finish samples where available.
  7. Review the priced BOQ. Check every line against your original before approving.

Common mistakes to avoid

Several errors appear again and again in hotel furniture BOQs. Quantities are updated in one document but not in another. Finishes are described as "oak colour" without a reference. Room types are merged, hiding the fact that suites need different items. Or the BOQ is sent without drawings, so the factory has to interpret the design.

A short internal check helps: one person builds the BOQ, another compares it with the latest drawings. Version numbers and dates on every sheet prevent old files from being priced by mistake.

Using the BOQ after the order

The BOQ does not end when the quotation is accepted. It becomes the reference for production tracking, packing lists and delivery checks. If the packing list follows the same item codes, receiving teams on site can tick off each item against the original document.

It also helps with phased deliveries. When floors are ready at different times, you can split the BOQ by floor or batch and know exactly what should arrive in each shipment.

Conclusion

A clear bedroom furniture bill of quantities saves time, reduces disputes and gives you a firm basis for comparing offers. It does not need to be complicated; it needs to be complete, consistent and linked to your drawings. If you are preparing one now, send us your room schedule, drawings or a draft BOQ. We will review it, point out missing information and come back with a quotation that follows your structure, for delivery to your project anywhere in the world.

Sıkça Sorulan Sorular

What is a bedroom furniture bill of quantities?

It is a structured list of every furniture item in a hotel's guest rooms, showing codes, descriptions, dimensions, materials, finishes and total quantities. Factories add unit prices to it, which turns it into a quotation that both sides can check line by line.

Who should prepare the BOQ: the buyer or the factory?

Ideally the designer, consultant or procurement team prepares it, because they know the full scope. If you have no BOQ, send drawings and a room schedule, and a factory can help draft one. Always review it yourself before approving prices.

What is the difference between a BOQ and shop drawings?

A BOQ fixes scope, quantities and price. Shop drawings come after the order and show detailed construction, exact dimensions and fixings for production. The BOQ item codes should match the drawing references so both documents stay aligned.

Can I use a BOQ to compare quotations from different factories?

Yes, if every supplier prices the same BOQ with the same specifications and delivery terms. Ask them to keep your item codes and order. Differences in material, hardware or Incoterms should be noted so that comparisons stay fair.

Should installation and packing be in the BOQ?

Yes, list them as separate lines or clear notes. Packing, spare parts, samples, installation and shipping terms all affect the final cost. Showing them separately makes it clear what is included and what is handled by others.

Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.

Get a quote for Bedrooms and Walk-in Closets

Share dimensions and quantities; we will prepare a quote for your project.